Part L methodology

The general approach of complying with Approved Document L would be:  
 Client briefs architects:

 Architects proposes a building, carry out or commission a specialist to calculate the whole building CO2 emission rate according to National Calculation Methodology (NCM), and make sure the proposed building has an CO 2 emission rate (BER) less than the target CO2 emission rate (TER), that is:
BER < TER
 Architect then specifies:
 The fractional area and the g factor of the glazing, and

 The U-values of different cladding zones, and the U-values of major components if necessary.
 Façade specialist contractor then carries out the detailed designs to meet the specification according to second tier document ‘The thermal assessment of window assemblies, curtain walling and non-traditional building envelopes’ published by CWCT.
This approach gives great design flexibility in choosing the U-value of components.




 

 Schematic diagram of the design procedure